Wednesday, September 16, 2015

Last weekend I went back down to work on the cabin some more. The weather was beautiful. I carried in 51 boards that are for the roof decking. I made several trips to the truck (0.6 miles away) and carried 7 boards at a time. I put up 28 of them to cover one side of the roof over the floor area. I plan to finish the other half next time. The boards are 1x6 tongue and groove, 8 feet long. Winter is just around the corner in the mountains so I probably won't get too much more done after decking the roof. It will be covered with a tarp over the winter.
 

I took a little time to do some detecting around the cabin. When I first started uncovering this, I thought it might be a gold pan or possibly another shovel...




 
 

 
Elk season started a couple of weeks ago. As I hiked to the truck Friday morning I could hear an elk bugling nearby. I go my bow out of the truck, returned and called the bull in to within about 85 yards. He smelled me and took off before I could get a glimpse of him. 




Thursday, September 10, 2015

Emily C Cabin Window and Door

Window cutout:
 
 
Planed the edges of the chainsaw milled boards:
 



 Interior side of door:
 
 
Got some chinking done too.


 
The boulder field behind the cabin has a lot of raspberry bushes. I was a little late to pick them as the frost has gotten them already.
 


Wednesday, September 2, 2015

Emily C Redo

I wasn't too happy with the roof pitch and low headroom in the cabin so last weekend I rebuilt the gables to steepen the roof. It was a lot of work but I like it a lot better now. It also allowed me to make the doorway taller. I had to take off the door frame lumber and decided to make some new boards with the chainsaw instead of carrying in additional lumber for it. It takes about an hour to saw a short log this way. There are hundreds of dead, dry lodgepole pine trees around so it is easy to get logs.