21st- fire
It was a controlled burn that got out of control when the wind started blowing hard. By the time we got there, the fire was under control but still being put out. A warehouse and some other buildings had burned down.
The truck we brought is used to haul water.
A fold-a-tank was placed next to an engine and we dumped water into that. The engine then pumped water from the tank to another engine which was putting out the fire.
I took some pictures while we were waiting for the truck in front of ours to dump.
Newspaper article about the fire:
http://www.helenair.com/articles/2007/03/21/helena_top/a01032107_01.txt
Sunday, March 18, 2007
18th - high about 65
Friday, March 16, 2007
16th- high ~ 50
Next, 2x4 s on 12 inch centers.
And then I covered it with 3/8 inch plywood.
This will be the form for the bottom of the arch bridge. I will have to make another form for the top. The idea is to pour 3 arches, each 4 feet wide. Then they will be placed side by side over the creek using a crane. The side arches will also each have a wall and will weigh about 19000 lbs.
Here is sort of a side view of the bridge. You can see the shape of the wall. The arch is the bottom circular part. Gravel will be used to fill in between the walls.
Brandon is flying in today and it looks like we will have nice weather. We plan to do some mountain bike riding and who knows what else.
Monday, March 12, 2007
12th - warm
Saturday, March 3, 2007
3rd - High 43
Here is a picture from one year ago when I had just gutted the house. It's come a long way but there is still a lot to do. What a mess.
.jpg)
Me and T.
Thursday, March 1, 2007
1st- projects and more projects
Guitar