I took off today to get some work done on the bridge. After cutting the curves out of plywood, I screwed them together to make the long curves.
Next, 2x4 s on 12 inch centers.
And then I covered it with 3/8 inch plywood.
This will be the form for the bottom of the arch bridge. I will have to make another form for the top. The idea is to pour 3 arches, each 4 feet wide. Then they will be placed side by side over the creek using a crane. The side arches will also each have a wall and will weigh about 19000 lbs.
Here is sort of a side view of the bridge. You can see the shape of the wall. The arch is the bottom circular part. Gravel will be used to fill in between the walls.