Well we got the bridge set today with no problems. It took about 4 hours. First, each section had to be stood upright and moved closer to the creek. This was a little tricky because they tended to want to roll over during this lift.
Here is the first one.
And the second:
And here is the last piece going into place over the creek.
It looks nice. Now we just have to backfill and build the driveway.

Thursday, May 31, 2007
Wednesday, May 30, 2007
Crane
Took the day off to get ready for the big day tomorrow. We're giving the old bridge away to someone who answered an ad in the paper. He is supposed to bring a trailer and the crane should be able to load it for him easily.
I dug out around the old bridge, hoping that the crane will also be able to lift out at least one of the old bridge foundations. It looks like it's about ready to fall over.
They dropped the crane off this afternoon. It's rated to lift 25 tons. The heaviest bridge section weighs 8 tons.
The creek is really high now and after almost washing downstream a couple of times, Pepper learned to cross the foot bridge.
I dug out around the old bridge, hoping that the crane will also be able to lift out at least one of the old bridge foundations. It looks like it's about ready to fall over.
Monday, May 28, 2007
28th - Good bye old bridge
Fred removed all the dirt and gravel from the old bridge. It was a railcar.
Sunday, May 27, 2007
27th - Our 1st Anniversary
Today was our anniversary. We had a nice picnic lunch beside the creek.
Sunday, May 20, 2007
Saturday, May 19, 2007
Final Concrete Pour
Here is the form, set up one last time. We put the date (2007) in the form using plastic numbers from Home Depot. There is also a conduit in the form so that I can run electric wire through the bridge and install an outlet at each end.

I was too busy to take any pictures during the pour, but it went well.

We have some nice lilacs in the front yard.
Monday, May 14, 2007
14th - very nice day
No pictures of the bridge project today. Fred is out of town so bridge work will continue tomorrow or Wednesday.
I got Brandon signed up for Baseball and Day camps for the summer. I am including a schedule of the first week of camp. I wish I could take the summer off and go on these trips and activities with him. I think he will have an enjoyable summer. Baseball tryouts are June 18th and games start July 9th.

Sunday, May 13, 2007
Happy Mother's Day
Fred had a helper to assist him on Saturday. He is trying to get the form ready for the third and final pour this coming Friday. Looks like it will probably be a go.
Thursday, May 10, 2007
10th - Isolated Thunderstorms
Sunday, May 6, 2007
Bridge Pour
Friday, Joe and I poured the second arch.
In this picture, we have just finished pouring the concrete and are starting to place the decorative stone in the wet concrete. This goes really fast and easy since there is no mortar to mix or apply.
It looks like river rock.
After the form is removed, I will finish covering the edges with "corners" that wrap around the edges.


One more to go.
In this picture, we have just finished pouring the concrete and are starting to place the decorative stone in the wet concrete. This goes really fast and easy since there is no mortar to mix or apply.