Shadow wanted to drive the 4 wheeler when we were hoisting it into place.
Sunday, April 1, 2012
Beaver Creek Sign
Yesterday I used the CNC machine to carve a sign for our driveway "arch". The sign is 10 feet long and it took the machine about 4 hours to carve it. After that, some black spray paint and sanding.
Subscribe to:
Posts (Atom)