Since we have lived here, we have had to cross the creek using a ford in order to get to the house. A bridge has been on the wish list for a long time now and after a rough winter it was moved to the top.
This bridge will be similar to the one we built over Beaver Creek in 2007, except that it will be bigger.
I drew plans for the bridge in Sketchup.
Step 1: make curved templates for the top and bottom plates of the forms. The inside radius of the arch is 13'-1" and the outside is 13'-9". The arch will be 8 inches thick.
Last time I made very large forms that proved to be difficult to handle. This time I made them in 4' long sections. There are 8 inside and 8 outside forms.
Here is the bridge location before starting work:
Step 2
Thursday I rented a mini excavator and dug out both banks.
Two dump truck loads of rip rap (large rocks) were delivered and placed in the holes.
After placing the rip rap:
Step 3
Reinforced concrete spread footing will be poured on the rip rap. Here is the first form going into place:
The creek is rising fast now that warmer weather has started melting the mountain snow. Hopefully I can get the concrete foundations poured before it gets too high.