Here are some picture of forming and pouring the middle precast arch:
Sunday, June 2, 2019
Sunday, May 12, 2019
360 Degree Panoramas
Something new this time: 360 degree panoramic pictures.
Roll the mouse wheel to zoom in.
Hold the left mouse button down and and move the mouse to look around.
https://roundme.com/@on_beaver_creek/tours
Wednesday, May 8, 2019
Bridge Continued
At the end of week 1 the foundations were poured along with a temporary slab to build the first precast arch on..
Here is the temporary slab with plywood nailed down and the first arch form in place.
The rest of the interior forms..
The first rebar cage. There was another cage tied later that is not shown.
The first arch was poured at the end of week 2. That was a 15 hour day and I did have some help from a friend. I have been working 2-3 long days per week on the bridge
2 more pours to go!